Parcel 1c

221 ACRES BKV Parcel 1c

CERTIFIED DUKE ENERGY READY SITE

Airport West Side blended aviation and corporate land for development. This acreage, plus parcels north of the newly built Telcom Drive extension comprise a 285 acre Duke Energy Project Readiness Industrial Site.

AERIAL TOUR

DESCRIPTION

Parcel 1c is optimal for many types of industrial projects. With as much as 2,000 ft x 150 ft of ramp space and aircraft operations area frontage, there is ample room for up to commercial-sized aircraft and multiple large hangar, manufacturing or other type facilities.

The parcel is bounded by Telcom Drive, Corporate Boulevard and Sgt. Lea Mills Boulevard. Additional ingress and/or traffic signaling may be planned, if called for by traffic study.

HIGHLIGHTS

  • Duke Energy Ready Site
  • Runway access
  • Newly built street and other roadway access
  • Sized to suit from 2 to 221 acres
  • Build to suit
  • Master Planned
  • Utilities available
  • Land needs clearing
  • Many opportunities to customize
  • Convenient customer and staff access from S.R. 589/Suncoast Parkway

REQUEST MORE INFORMATION